New Plans being Laid for Lake Padre Area

New Plans being Laid for Lake Padre Area
5 (100%) 4 votes

What do Bricktown, Oklahoma City and North Padre Island, Corpus Christi have in common? A water taxi system! Or at least, soon to be.

With Schlitterbahn, Harbor Marina, and Island Walk Village coming in phases to Padre Island, this picturesque canal system linking the island’s main attractions will bring new tourism and new life into the Island. Paul Schexnailder, a partner in the project, highlighted some of the main and most exciting aspects today at the State of the Islands talk, held at the Comfort Suites by San Jacinto Title Services.

CLICK ON PICTURE BELOW TO BLOW UP AND DOWNLOAD OR PRINT A COPY

Schlitterbahn, still set for a soft opening at the end of May, is part of Phase I. Although rain and labor has hurt the construction schedule, Jeff Henry, co-owner, has said this is the best park he has ever built. And we’re OK with that…good things come to those who wait! Here’s why!

The main clubhouse boosts four stories of fun.

  • 1st Floor: “Fajitas” restaurant and retail space
  • 2nd Floor: The floor for the locals – will have TVs, a lounge, a game room, and food and drinks
  • 3rd Floor: A 4500 square foot event center, equipped with 6 meeting rooms
  • 4th Floor: Fine dining open to the public, as well as  a private dining room for golf course and park members only
  • There will also be roughly 80 hotel rooms in the building 

To top it off? The clubhouse overlooks an Amphitheater that can hold approximately 2000 people. This was not in the original plans, but it sounds like the perfect place for some great island venues. You got fins to the left, fins to the right… 

Harbor Marina, set to be operating this time next year, will be instrumental in the “Water Taxi” System. Referring to the maps provided, Cruiser canal is being expanded to continue straight and curve to go toward the marina. See the arrows on the maps? That is where a new bridge is going to go (between Commodores and Whitecap). It will orchestrate boat and pedestrian traffic by 3 separate arches. The center arch will be for the boats, and the two arches on either side will be for pedestrians and golf carts. The canal archway will have a 13 foot clearance, whereas the two pedestrian archways will have a 10 foot clearance. The canals will be finished late 2015, early 2016, and the bridge has an end-of-the-year completion date. 

Island Walk Village is an Ingredient in Phase II. And yes, I am talking restaurants. It will be the site of at least 6 restaurants all up and down the newly dug canal system (will there be gondola rides in our future?). The structures will house the eateries on the main levels by the water, and then living spaces above that. Worried about parking? Don’t. The village has been drawn to have about 1400 parking spots.

..And even though gossip of a grocery store is spinning, those in “the know” are being understandably coy about the details. The good news is, there WILL be one!

This hardly touches the exciting developments the island will see over the next 5-10 years. The good news is that we have a built-in market here on our coast, and something tells me it won’t be “off the grid” much longer.

Email: Whitney@Coastline-Properties.com
Office: 361-949-0101
Cell: 847-830-2087
Fax: 361-949-0192

Facebook Twitter YouTube